...
...
...
...
Rules and
...
Instructions:
JD Power should use these two endpoints created by PureSpectrum:
(API) Endpoints 1: YELLOW FLOW - Con-validate the Respondent with Pure-spectrum:
This end point is used to Validate the PSID if belongs to a supplier that agree to work with Modular survey - In case the PSID is valid, the end point returns a new Transaction ID
JD Power needs to capture from the URL these 3 parameters:
Survey ID: Survey identification →
survey_id
Supplier ID: Supplier identification →
supplier_id
Transaction ID: Transaction identification →
transaction_id
NOTE: Make sure the 3 variable are enabled in Buyer settings
ENDPOINT SPECIFICATION HERE
Status colour Red title LINK to ADD
(API) Endpoints 2: GREEN FLOW - When the respondent finalize the screener or the modular study, use this endpoint to register the respondent as Complete
ENDPOINT SPECIFICATION HERE
Status colour Red title LINK to ADD
JD Power should redirect the Respondent to PS redirect link
/surveydone
only at the end of the survey in these 2 occasions:Respondent is not qualified → Buyer terminated (18)
Respondent completed the study → Complete (21)
In both cases JD Power has to redirect to the 1st Transaction ID received.
JD Power - Survey Creation in Marketplace:
Create a new only one single survey and in Launch page on Marketplace activate the feature
Modular Launch
In order to check the transaction id that belongs to a "MODULAR Survey“, you can filter by this field name:
Status colour Red title FIELDNAME to ADD
Schema:
...
Buyer Configuration:
Operator should activate a configuration flag under Configuration Settings - Modular Survey
EXAMPLEStatus colour Red title EXAMPLE to ADD
Buyer should activate the supplier ID in Buyer settings
Buyer Settings:
...